论文部分内容阅读
随着小水电建设事业蓬勃发展,如何管好、用好这些小水电厂的问题也日渐突出,本文简要介绍西大洋水电厂的办厂情况,以期达到互相讨论共同提高的目的.一基本情况西大洋水电厂位于保定地区唐河上游西大洋水库坝后,设计水头31.6米,设计流量3×11.5米~3/秒,装机容量3×3000千瓦(不包括正在扩建的机组),装有三台喀什型水轮发电机组.通过三条35千伏线路分别向唐县、灵山和近区输电,为城镇矿区和农村提供生产及生活电源.
With the thriving development of small hydropower construction, the issue of how to manage well and make good use of these small hydropower plants has become increasingly prominent. This article briefly introduces the situation of setting up factories in Western Ocean Hydropower Plant with a view to reaching the goal of mutual improvement and mutual improvement. Located in the upper reaches of the Tanghe River upstream of the Western Ocean Reservoir in Baoding, Dayang Hydropower Plant has a design head of 31.6 meters and a design flow of 3 × 11.5 m 3 / s with an installed capacity of 3 × 3000 kW (excluding the expanding unit) Hydroelectric generating units, which respectively transmit power to Tangxian, Lingshan and the near areas via three 35-kilovolt lines, and provide power for production and living in urban mining areas and rural areas.