论文部分内容阅读
介绍了复地·东山国际A区项目三标的工程内容,并对其管线交叉施工的特点及难点进行了分析,总结了市政管网工程施工中可能出现的几种质量通病,并提出了相应的防治处理措施,以供参考。
This paper introduces the project contents of the third standard of Forte Dongshan International A zone project and analyzes the characteristics and difficulties of its pipeline cross construction, summarizes some common quality problems that may appear in the construction of municipal pipe network engineering, and puts forward the corresponding Control measures for reference.