在大厚度湿陷性黄土场地,对黄土湿陷性进行处理以达到地基设计承载力要求是必须的。在工程实例中拟采用两种地基处理方案:一是先对湿陷性地基土进行强夯处理来提高地基承载力,再采用桩基础穿越全部湿陷性黄土层,将荷载传至下部压缩性极低的非湿陷性黄土地层上;二是仅采用桩基础来消除地基湿陷性的影响。对两种地基处理方案进行对比评价表明:本例中采用方案一更为合理、经济。
In large thick collapsible loess sites, it is necessary to deal with the collapsibility of loess in order to meet the bearing capacity requirements of foundation design. In the project example, two kinds of foundation treatment schemes are proposed: one is to treat the collapsible foundation soil by dynamic compaction to improve the bearing capacity of the foundation, and then use the pile foundation to cross all collapsible loess layers to transfer the load to the lower compressibility Very low non-collapsible loess formation; Second, only the use of pile foundation to eliminate the impact of subsidence. The comparison and evaluation of the two kinds of foundation treatment programs shows that in this case, the first scheme is more reasonable and economical.