论文部分内容阅读
1994年11月19日18时30分,一艘10万吨级巨轮“曼丹”驶离北仑港卸矿泊位,至此,这个公司今年累计完成的货物吞吐量已超过年计划3万余吨,提前42天迎来了1995年。 为了加速钢铁工业发展,我国每年从巴西、澳大利亚、南非等地进口大量优质铁矿,北仑港在国内外经济舞台上的角色就日显重要。他们抓住机遇发展自身,1994年1~10月。铁矿接卸量和货物吞吐量每月分别突破100万吨和200万吨。继1993年12月5日首次实现年接卸铁矿1000万吨以后,1994年9月16日又比1993年提前两个多月再
At 18:30 on November 19, 1994, a 100,000-ton ship “Mandan” left Beilun Port unloading berths, so far this year the company completed the cargo throughput has exceeded the annual plan of more than 30,000 tons, 42 days in advance ushered in 1995. In order to accelerate the development of the iron and steel industry, China imports a large amount of high-quality iron ore each year from Brazil, Australia and South Africa. The Beilun Port plays an increasingly important role in the economic arena both at home and abroad. They seized the opportunity to develop themselves, from January to October 1994. Iron ore loading and unloading volume and cargo throughput exceeded 1 million tons and 2 million tons each month respectively. Following the first realization of the 10-million tons of unloading iron ore on December 5, 1993, more than two months ahead of schedule in 1993 on September 16, 1994