1998年5月29日10时18分,李家峡水电站第3台400MW大型水轮发电机组顺利通过72小时试运行,并网发电,从而使该电站成为世界上继国外两座双排机电站后仅有的第三座采用双排机新技术布置的水电站,填补了我国水轮机双排设计及运行的空白。李家峡水电站位...
At 10:18 on May 29, 1998, the third 400MW large-scale hydro-generating unit of Lijiaxia Hydropower Station successfully passed the 72-hour trial operation and grid-connected power generation, making it the world’s second largest double-row electromechanical power station in the world Some third hydropower stations that are equipped with double-row machines and new technologies have filled in the blank of the double-row design and operation of turbines in our country. Lijiaxia hydropower station ...