原石漫滩水库建于1951年,是新中国成立后在淮河流域上游修建的第一座大型水库,坝型为均质土坝。“75·8”特大暴雨造成大坝垮坝失事。由于滚河上游失去控制,下游河道狭窄,排洪不畅,致使洪河流域洪涝灾害频繁。原计划利用石漫滩水库作为工业水源的舞钢公司被迫改用地下水,随着建设项目的陆续建成投产,用水量增加,地下水超采,引起地下水位急剧下降,工业供水短缺,城市及农业灌溉用水受到严重影响。因此,河南省及当地政府和有关部门为地区的经济
The original stone flood beach reservoir was built in 1951, is the first large reservoirs built in the upper reaches of the Huaihe River after the founding of new China, the dam type is a homogeneous earth dam. “75.8 ” Heavy rain caused the collapse of the dam collapse. Due to the uncontrolled upper reaches of the river, the narrow reach of the lower reaches of the river and the poor flood drainage led to frequent flooding in the Honghe River Basin. Wugang Company, which originally planned to use Shimantang reservoir as an industrial water source, was forced to switch to groundwater. As construction projects were put into operation one after another, water consumption increased and underground water overdrawn, resulting in a drastic drop in groundwater level, a shortage of industrial water supply, urban and agricultural Irrigation water is severely affected. Therefore, Henan Province and local government and relevant departments for the regional economy