我队是黑龙江省第一支机掘坑探专业队。一九七六年筹建,根据生产需要下设机掘分队,现有职工一百二十五人。其中大队领导三人,坑探付主任工程师一人,工程师一人,机械技术员一人,安全技术员一人,九十五名工人,其他为行政管理和服务人员。我队是省局统一调动,专门承担我局各综合地质队机掘坑探工程任务的专业队。从建队以来,每年都分别在两个矿区投入生产,施工的头一年完成斜井50米,台月效率为84.7米,比计划提高34%;井下平巷114米,台月效率为150米,比计划提高24%。在另一个矿区完成平巷500余米,台月效率为130米,比计划提高27%。第二年完成平巷828米,其中在一个矿区完成510米独头巷道,台月效率为142米,比计划提高11%。今年仍沿着510米的独巷继续施工。
My team is the first excavation team in Heilongjiang Province. Construction in 1976, according to production needs under the machine dig teams, the existing staff of 125 people. Among them, the brigade led three people, one pit exploration engineer, one engineer, one mechanic technician, one security technician, 95 workers, others were administrative and service personnel. Our team is a unified mobilization of the provincial bureau, specializing in the Bureau of our comprehensive geological team pit excavation project task team. Since the construction of the team, the mine has been put into operation in two mining areas each year. In the first year of construction, an inclined shaft of 50 meters was completed. The efficiency of Taiwan and the moon was 84.7 meters, an increase of 34% over the planned figure. The 114 meters of downhole and the monthly efficiency of 150 meters M, 24% more than planned. In another mining area to complete the lane more than 500 meters, Taiwan and Taiwan efficiency of 130 meters, 27% higher than planned. The second year completed 828 meters of leveling lane, of which 510 meters of single-lane roadway was completed in a mining area. The efficiency of Taiwan and Taiwan reached 142 meters, 11% more than planned. This year is still along the 510-meter alley to continue the construction.