论文部分内容阅读
通过阐述呼和浩特铁路局煤炭战略装车点建设的现状,根据煤炭战略装车点建设的形式,分析了贯通单线直列式、贯通多线直列式和贯通环线式的优势和不足,从战略装车点建设标准、既有货物线站台改造标准、装卸机具及作业人员配备标准、货车超载及轨道衡管理考核标准和完善轨道衡用管修制度的角度,提出了煤炭战略装车点建设质量的对策。
By elaborating the status quo of the construction of coal strategic loading point in Hohhot Railway Bureau, according to the form of coal strategic loading point, the advantages and disadvantages of penetrating single line inline and through multiline inline and through loop are analyzed. From the strategic loading point Construction of standards, both the transformation of the standard station platform for goods, loading and unloading machines and workers with standard equipment, truck overloading and track management assessment standards and improve the track system with the perspective of management system, put forward the construction strategy of coal strategic loading point.