论文部分内容阅读
1·压实定额里有推土机(平地机)台班,项目内容有“推土机整平土方”,但是含量不高。对这个一直存在两种看法:(1)推土机是指压实前整平卸土,配合碾压。(2)只是碾压过程中配合,不含压实前整平卸土。不知定额编制是如何考虑的?另外,桥涵预算章节,基础垫层是按人工铺筑,但很多时候
1. Compaction quota includes bulldozer (grader) class, the content of the project is “bulldozer leveling earth”, but the content is not high. There have been two views on this: (1) Bulldozer refers to the level before the compaction of unloading soil, with rolling. (2) Only with the rolling process, without compaction before the level of unloading. I do not know how to consider the quota? In addition, the bridge and culvert budget chapter, the foundation cushion is manually paved, but many times