论文部分内容阅读
2011年4月2日,河南省水利普查2011年工作会议在郑州召开。省普查办主任、副厅长王建武出席会议并作重要讲话,厅总工程师申季维主持会议。据悉,河南省水利普查前期准备阶段各项工作已基本完成,2011年水利普查工作的重点从前期准备转变为普查工作的组织实施,标准时点为2011年12月31日,时期资料为2011年
April 2, 2011, Henan Province Water Census 2011 Working Conference held in Zhengzhou. Provincial census office director, deputy director Wang Jianwu attended the meeting and made an important speech, Chief Engineer Shen Jiwei presided over the meeting. It is reported that Henan Province, the preliminary stage of water census preparatory work has been basically completed in 2011, the focus of water census work from pre-preparation for the implementation of the census work, the standard time point for the December 31, 2011, the period for the 2011 data