广州抽水蓄能电站是我国最大的抽水蓄能电站 ,总装机容量 8× 30 0 MW,分二期建设 ,共用上、下水库 .一、二期电站分别设 1条引水隧洞 ,采用独立地下厂房和开关站 ,可独立接入电网 ,并设一回联络线连接 .该电站采用高参数机组、5 0 0 k V超高压电气设备、计算机监控系统等先进设备 .工程设计中应用多项国内外领先的技术 ,有多项成果获奖 .电站于 1 993年并网发电 ,截止到 1 999年底累计发电 6 1亿 k W· h,抽水耗电 80亿 k W· h,在广东电网中担负调峰、填谷、调频、调相、事故备用等任务 ,对电网核电安全稳定运行发挥着重要的作用 .广东省抽水蓄能资源丰富 ,电网急需蓄能电源 ,现已确定惠州站址为广东省第二个抽水蓄能电站首选站址 ,其预可研报告已经完成 .
Guangzhou Pumped Storage Power Station is the largest pumped storage power station in our country with a total installed capacity of 8 × 30 0 MW and is divided into two phases to share the upper and lower reservoirs. One or two hydropower stations are equipped with 1 diversion tunnel respectively, And switchgear, can be independently connected to the power grid, and set up a connection line connection.The plant uses high-parameter units, ultra-high voltage electrical equipment 50000 V, computer monitoring system and other advanced equipment. Engineering design used a number of domestic and foreign Leading technology, a number of awards received.Power station in 1993 and power generation, by the end of 1999 a total of 600 million kw · h power generation, pumping power consumption 8 billion kw · h, in charge of Guangdong Power Grid Peak, fill the valley, FM, phase modulation, accident backup and other tasks, the safe and stable operation of nuclear power network plays an important role in Guangdong Province, rich in pumped storage, power grid urgently need energy storage has been identified Huizhou site for the Guangdong Province The second pumped storage station preferred site, the pre-feasibility study report has been completed.