本文用三维有限中元法对混凝土拱坝进行非线性计算,计算中分别考虑了坝体、接缝和基岩材料非线性模型。以单元高斯点的应力值确定坝体开裂范围,同时采用压扁的坝体单元来模拟接缝和夹层。用交替迭代法和扩大初应力结点荷载的方法来求解非线性结点平衡方程组,从而提高收敛速度并缩短计算时间。用本文介绍的程序进行的马岭头水库周边缝拱坝的非线性计算,其结果与实测资料较相符。 In this paper, three-dimensional finite element method for nonlinear calculation of concrete arch dam, the calculation of the dam, seam and bedrock material nonlinear model were considered. The cracking range of the dam is determined by the stress value of the Gaussian point of the unit, and the flattened dam body element is used to simulate the joint and the interlayer. The alternating iteration method and the method of expanding the stress of initial stress nodes are used to solve the nonlinear node equilibrium equations to improve the convergence speed and shorten the calculation time. The nonlinear calculation of the arch dam around the Malingtou Reservoir by the program introduced in this paper is in good agreement with the measured data.
其他文献
本文首先阐述了对外汉语教学与汉语国际教育的发展历史,然后对其重要性进行了分析,最后总结了对外汉语教学与汉语国际教育的发展展望,以供广大读者参考。 This paper first
二语习得研究作为一门独立的学科已有超过40年的发展历史,分析二语习得的研究现状,对今后的二语习得发展有着重要的作用和意义。本文对国内二语习得研究现状进行分析总结,概
2013年4月18-19日,国家林业局计资司在昆明召开由国家林业局昆明勘察设计院主编的《森林防火专业队伍建设标准》、《林火阻隔系统建设标准》、《林区公路设计规范》三个标准
交替传译教学中如何有效提高学生的转换表达技能一直以来未能得到足够重视。本文尝试对口译的转换表达能力进行定义和内涵探讨,从转换表达技能提高所需训练时间、教材与材料
单位线法是现行洪水计算和洪水预报中常用的一种方法。纳希瞬时单位线具有一个较严密的数学函数式,模式中的参数(n×K)是一个揭示流域汇流本质的参数,物理概念明确,便于综合
甘肃工业大学水机教研室设计了一种全贯流微型整装水轮发电机组,其中直径为300毫米的机组,已安装在武威县南营卿进行运转考验。该机组具有两个伸出轴,其一供联接发电机之用,
近年来 ,电视胸腔镜手术 (Video- Assisted ThoracscopicSurgery,VATS)已广泛应用于胸外科 ,并取得较好的效果 [1 ] ,我院自 2 0 0 1年 5月~ 2 0 0 3年 5月共进行 VATS下食管
中介语在二语习得理论中有着非常重要的作用,中介语也可称之为语际语或者过渡语,中介语是介于母语、目的语之间的语言状态,学习者在学习第二语言时建立的关于第二语言的比较
北京申办2008年奥运会的工作正在紧锣密鼓地进行,“新北京新奥运”的宣传画随处可见。据介绍,6月19日,北京2008年奥运会申办委员会秘书长王伟,已专程去洛桑向国际奥委会送交
本文把模糊矩阵交与并的概念,及其运算法则应用到阐述单库保证出力动态规划法的过程中,论证了按等出力调节计算年调节水电站保证出力的结果最优这一具有实际意义的结果。 用