论文部分内容阅读
摘要:随着景观环境的不断提升,加快了园林绿化的飞速发展,通过大树移栽能很好的保护树木资源,优化城市景观,美化城市环境,加速园林绿化进程。本文主要介绍了通过实践研究取得的园林工程中大树长枝榆的栽植过程及养护技术要点。通过树木移植的前期准备、移植树木的起挖、移植树木的栽植、移栽树木后期的养护等方面介绍园林大树长枝榆的移植及其养护管理。
关键词:大树 移植技术 养护管理
Abstract: with the continuous improvement of landscape environment, accelerate the rapid development of the landscape. By transplanting a good conservation of tree resources, optimizing the urban landscape and beautify the urban environment, accelerate the process of landscaping. This article mainly introduces the big trees in landscape project in the study through practice long Elm planting and maintenance techniques. Through preparation, transplanting trees dig, transplanting of trees, such as tree planting, transplanting tree conservation in the late introduction of gardens elm trees long branches transplantation and its maintenance
Key words: Big tree Transplant technology Maintenance and management
中图分类号:S688文献标识码:A
当前,随着城市化建设的加快,人民生活水平的提高,在城市园林、小区的营造中,往往要在较短的时间内体现绿化、美化、成形快的效果,故大树移植得到越来越多的应用。大树价格不菲,移植既费上又费时,同时大树的再生能力比幼树明显减弱,成活率低。笔者在实践的基础上,提出乌鲁木齐常见园林树种长枝榆移栽保活及养护技术中应注意的一些技术措施。
材料的选择及前期准备
(一)材料的选择
树种长枝榆喜光、耐寒,对土壤要求不严,果形独特美观,是目前乌鲁木齐地区常见的园林绿化树种,用作庭荫树、行道树或风景林。由于规划用地,5月初在开发区合作区纬十六路有二十余棵胸径均为25至35cm之间的大叶白蜡,移植至头屯河工业区绿化林带内。
(二)移植前的前期准备工作
(1)对移植树木蛀杆害虫小蠹虫全面防治。在树干中部向地面30度角打直径0.5cm,深6-8cm孔,每孔注射100倍甲拌硂15ml,按农药操作要求做好人员防护。
(2) 定制树木周转箱,侧板上底1米,下底0.8米,高0.8米。
二、移植操作措施
(一)起植树木
根据树种的生长习性和生长状况判断成活难易。有条件应提前2-3 a于东、南、西、北四周一定范围内开沟断根,每年只断全周的1/2-1/3,断根范围一般以干周或干径的5倍作半径,成方或圆开宽30-40 cm的沟,深度为50-70 cm,也就是园林行业的"断根缩坨"法[1]。
取除地表覆土至平根处开始下挖,先挖出1.1米×1.1米土方,深0.8米土团,再精细按周转箱报尺寸修出土团。(土球挖开后一定要进行修根处理,把烂根、撕裂根、过干的根切口进行修剪,修剪完后进行用“大树根动力”喷洒,)用塑钢带通过打包机将四面固定,必要加钉加固。钉上顶板后,将土团底部平入挖穴,松动后沿路方向推倒,修平底部,加固上底板。用钢塑带“井”字型加固周转箱。
(二)吊装
在树杆1.5米高处钉五条分力板条,每条上、下、中用三颗铁钉固定吊装时吊绳不可脱出分力板条,以防树皮脱离,上车时树头向后,不可拖地,接触车箱板沿的树杆必须加铺软物,以防树杆受伤,树枝用草绳缩冠,减少树冠受伤,吊栽前对伤枝、中心枝适当疏剪。并适当去除叶片,吊装、吊栽过程一定赶在阴天或在每天太阳落山或日出前运走。当晚运到的树木一定保质保量种植。
(三)栽植
开宽1.5米,深0.7米沟,株距2.5米,行距6米假植,布滴灌设备,搭6米高棚架,备60%遮阴网,设顶部微喷,每棵树加“国光牌”营养综合液。
(四)浇水
树木种植后浇透水,保证充足水分,及时覆土,再浇水。采用顶端微喷处理。
(五)支撑
为避免树木种植浇水后土壤松软导致树木倾斜,进行支撑处理。
(六)遮荫网及营养液
栽植后的苗木生长势较弱,在缓苗期间为避免紫外线的直射,需用遮荫网处理。同时,为增强移植后树木的营养,掛营养液吊瓶和喷施叶面肥。
(七)管护
专人管护,制订管护措施,记录管护日志,定期专家研讨指导,创造适宜移栽树木生长的小气候,确保树木生长势,以备应急树木更换。
三、大树移植后的思考
(一)选择品种和植株
移植大树最好选择假植苗,假植苗须根多,有利于树木种植后吸收水分和养分,恢复树势。假植苗植株要求树木干直,树形优美,树皮无破损和病虫危害,生长势良好。对于所选树木应考虑原生态环境(海拔、气温、水分状况、光照条件、土壤状况)与种植后的生态环境,如果差异太大,移植成功率会比较低。
(二)选择移植时间,对温度的要求也不同
为提高树木移植的成活率,北方树种要求有明显的季节性,春季与秋季移植为最佳时间,同时要选择在连阴天或降雨前后移植,如果工期要求紧张,必须在晴天栽植,要避开气温高、阳光猛烈、空气湿度低的大气,那么最好选择在傍晚太阳落山后起苗,尽量减少苗木暴露在强光下的时间,减少水分流失[2]。
(三)选择种植土壤
大树移植应考虑树木生长对土壤的要求,施工时需要进行土壤改良,满足栽培树种对土壤酸碱度的要求,对不符合要求的重粘土、有建筑垃圾、被污染的或土质贫疮的土壤进行土壤更换,选择通气透水、有保水保肥性能、富含有机质和矿物质的肥土和泥炭土。种植前用50%克百威颗粒剂撒拌在种植土内杀虫,药剂拌土的比例为0.1%。
(四)移植前的注意点
树木进入生长期,又要保树冠,又要确保二次移植,保树木的生长势,必须重视几个环节,一、土球规格较常规方案要大一级;二、确保土球不散,半年内二次调移完好;三、调运过程中树干树根伤到最小化;四、管护措施,多管齐下,水、肥、气、热调节到最佳点,并做好病虫害的防治。
(五)移植后的养护措施
移植后的绿化养护措施要做到位,一是根据树形采用适宜的修剪方式适当修剪,二是采用缠干措施,常用的材料为草绳,蒸发严重的时候还可在内部加一层塑料布,缠干一方面可以避免日光和干热风对树干的影响,有效减少水分蒸发;另一方面可以保湿,在对树体喷水时,草绳可以吸收更多的水分,这些水不会很快蒸发,供树体吸收此外缠干还可以使树体冬季免受冻害,有效防寒[2]。三是加强病虫害防治,坚持预防为主的原则,据当地病虫害发生情况随时观察,适时采取预防措施[3]。针对季节性的或者部分树种易发生的病虫害要及时根治,以减轻树木的生长负担。四是加强水分管理及喷施蒸腾剂。生根前,要尽量保持土壤的水分介于湿润和干燥之间,且要偏湿润;生根后,要进行正常的水分管理,浇水要掌握“不干不浇,浇则浇透”的原则,保持土壤含水量在最大持水量的50% -60% 之间。蒸腾抑制剂可以降低苗木的蒸腾速率,且对光合速率和生长影响不大。特别是在规格较大、珍贵稀有以及古树上使用,可以促进树木的成活。蒸腾抑制剂不仅可以促进苗木成活,还可以保持苗木有良好的生长势,促进其旺盛生长。但是要注意必须在移栽养护的前期施用,过晚效果不明显;还有蒸腾抑制剂为辅助措施,不可忽视其它正常的管理。
四、小结
如何提高大树移植的成活率,是生态效应和景观效果是否出成果的关键。大树入城是提高城市绿化品位,改善城区居住环境的一条重要而有效的途径[4]。大树移植要科学、合理、有序的进行。因此,为了提高大树移植的成活率,减少城市园林绿化过程中的经济损失,在大树移植过程中,我们必须严格按照大树移植技术要求的步骤执行,对大树移植进行实时、实地监控,同时不断探索,提高大树移植的技术,以达到移植的成活最终效果。
参考文献:
[1] 陈有民.园林树木学[M].北京:中国林业出版社,1990.
[2]陈欣玲.园林工程中大树移植办法及其养护[J]河北林果研究2011,26卷(1)
[3]周樟炳,张良,黄宗昌城市绿化工程大树移植技术[J]绿色科技2011,(2)
[4]杨秀丽 赵 娟,关于大树移植及管理技术的探讨[J]现代园艺2011(8)
丁鑫,本科园艺专业,硕士研究生,从事园林绿化工作
关键词:大树 移植技术 养护管理
Abstract: with the continuous improvement of landscape environment, accelerate the rapid development of the landscape. By transplanting a good conservation of tree resources, optimizing the urban landscape and beautify the urban environment, accelerate the process of landscaping. This article mainly introduces the big trees in landscape project in the study through practice long Elm planting and maintenance techniques. Through preparation, transplanting trees dig, transplanting of trees, such as tree planting, transplanting tree conservation in the late introduction of gardens elm trees long branches transplantation and its maintenance
Key words: Big tree Transplant technology Maintenance and management
中图分类号:S688文献标识码:A
当前,随着城市化建设的加快,人民生活水平的提高,在城市园林、小区的营造中,往往要在较短的时间内体现绿化、美化、成形快的效果,故大树移植得到越来越多的应用。大树价格不菲,移植既费上又费时,同时大树的再生能力比幼树明显减弱,成活率低。笔者在实践的基础上,提出乌鲁木齐常见园林树种长枝榆移栽保活及养护技术中应注意的一些技术措施。
材料的选择及前期准备
(一)材料的选择
树种长枝榆喜光、耐寒,对土壤要求不严,果形独特美观,是目前乌鲁木齐地区常见的园林绿化树种,用作庭荫树、行道树或风景林。由于规划用地,5月初在开发区合作区纬十六路有二十余棵胸径均为25至35cm之间的大叶白蜡,移植至头屯河工业区绿化林带内。
(二)移植前的前期准备工作
(1)对移植树木蛀杆害虫小蠹虫全面防治。在树干中部向地面30度角打直径0.5cm,深6-8cm孔,每孔注射100倍甲拌硂15ml,按农药操作要求做好人员防护。
(2) 定制树木周转箱,侧板上底1米,下底0.8米,高0.8米。
二、移植操作措施
(一)起植树木
根据树种的生长习性和生长状况判断成活难易。有条件应提前2-3 a于东、南、西、北四周一定范围内开沟断根,每年只断全周的1/2-1/3,断根范围一般以干周或干径的5倍作半径,成方或圆开宽30-40 cm的沟,深度为50-70 cm,也就是园林行业的"断根缩坨"法[1]。
取除地表覆土至平根处开始下挖,先挖出1.1米×1.1米土方,深0.8米土团,再精细按周转箱报尺寸修出土团。(土球挖开后一定要进行修根处理,把烂根、撕裂根、过干的根切口进行修剪,修剪完后进行用“大树根动力”喷洒,)用塑钢带通过打包机将四面固定,必要加钉加固。钉上顶板后,将土团底部平入挖穴,松动后沿路方向推倒,修平底部,加固上底板。用钢塑带“井”字型加固周转箱。
(二)吊装
在树杆1.5米高处钉五条分力板条,每条上、下、中用三颗铁钉固定吊装时吊绳不可脱出分力板条,以防树皮脱离,上车时树头向后,不可拖地,接触车箱板沿的树杆必须加铺软物,以防树杆受伤,树枝用草绳缩冠,减少树冠受伤,吊栽前对伤枝、中心枝适当疏剪。并适当去除叶片,吊装、吊栽过程一定赶在阴天或在每天太阳落山或日出前运走。当晚运到的树木一定保质保量种植。
(三)栽植
开宽1.5米,深0.7米沟,株距2.5米,行距6米假植,布滴灌设备,搭6米高棚架,备60%遮阴网,设顶部微喷,每棵树加“国光牌”营养综合液。
(四)浇水
树木种植后浇透水,保证充足水分,及时覆土,再浇水。采用顶端微喷处理。
(五)支撑
为避免树木种植浇水后土壤松软导致树木倾斜,进行支撑处理。
(六)遮荫网及营养液
栽植后的苗木生长势较弱,在缓苗期间为避免紫外线的直射,需用遮荫网处理。同时,为增强移植后树木的营养,掛营养液吊瓶和喷施叶面肥。
(七)管护
专人管护,制订管护措施,记录管护日志,定期专家研讨指导,创造适宜移栽树木生长的小气候,确保树木生长势,以备应急树木更换。
三、大树移植后的思考
(一)选择品种和植株
移植大树最好选择假植苗,假植苗须根多,有利于树木种植后吸收水分和养分,恢复树势。假植苗植株要求树木干直,树形优美,树皮无破损和病虫危害,生长势良好。对于所选树木应考虑原生态环境(海拔、气温、水分状况、光照条件、土壤状况)与种植后的生态环境,如果差异太大,移植成功率会比较低。
(二)选择移植时间,对温度的要求也不同
为提高树木移植的成活率,北方树种要求有明显的季节性,春季与秋季移植为最佳时间,同时要选择在连阴天或降雨前后移植,如果工期要求紧张,必须在晴天栽植,要避开气温高、阳光猛烈、空气湿度低的大气,那么最好选择在傍晚太阳落山后起苗,尽量减少苗木暴露在强光下的时间,减少水分流失[2]。
(三)选择种植土壤
大树移植应考虑树木生长对土壤的要求,施工时需要进行土壤改良,满足栽培树种对土壤酸碱度的要求,对不符合要求的重粘土、有建筑垃圾、被污染的或土质贫疮的土壤进行土壤更换,选择通气透水、有保水保肥性能、富含有机质和矿物质的肥土和泥炭土。种植前用50%克百威颗粒剂撒拌在种植土内杀虫,药剂拌土的比例为0.1%。
(四)移植前的注意点
树木进入生长期,又要保树冠,又要确保二次移植,保树木的生长势,必须重视几个环节,一、土球规格较常规方案要大一级;二、确保土球不散,半年内二次调移完好;三、调运过程中树干树根伤到最小化;四、管护措施,多管齐下,水、肥、气、热调节到最佳点,并做好病虫害的防治。
(五)移植后的养护措施
移植后的绿化养护措施要做到位,一是根据树形采用适宜的修剪方式适当修剪,二是采用缠干措施,常用的材料为草绳,蒸发严重的时候还可在内部加一层塑料布,缠干一方面可以避免日光和干热风对树干的影响,有效减少水分蒸发;另一方面可以保湿,在对树体喷水时,草绳可以吸收更多的水分,这些水不会很快蒸发,供树体吸收此外缠干还可以使树体冬季免受冻害,有效防寒[2]。三是加强病虫害防治,坚持预防为主的原则,据当地病虫害发生情况随时观察,适时采取预防措施[3]。针对季节性的或者部分树种易发生的病虫害要及时根治,以减轻树木的生长负担。四是加强水分管理及喷施蒸腾剂。生根前,要尽量保持土壤的水分介于湿润和干燥之间,且要偏湿润;生根后,要进行正常的水分管理,浇水要掌握“不干不浇,浇则浇透”的原则,保持土壤含水量在最大持水量的50% -60% 之间。蒸腾抑制剂可以降低苗木的蒸腾速率,且对光合速率和生长影响不大。特别是在规格较大、珍贵稀有以及古树上使用,可以促进树木的成活。蒸腾抑制剂不仅可以促进苗木成活,还可以保持苗木有良好的生长势,促进其旺盛生长。但是要注意必须在移栽养护的前期施用,过晚效果不明显;还有蒸腾抑制剂为辅助措施,不可忽视其它正常的管理。
四、小结
如何提高大树移植的成活率,是生态效应和景观效果是否出成果的关键。大树入城是提高城市绿化品位,改善城区居住环境的一条重要而有效的途径[4]。大树移植要科学、合理、有序的进行。因此,为了提高大树移植的成活率,减少城市园林绿化过程中的经济损失,在大树移植过程中,我们必须严格按照大树移植技术要求的步骤执行,对大树移植进行实时、实地监控,同时不断探索,提高大树移植的技术,以达到移植的成活最终效果。
参考文献:
[1] 陈有民.园林树木学[M].北京:中国林业出版社,1990.
[2]陈欣玲.园林工程中大树移植办法及其养护[J]河北林果研究2011,26卷(1)
[3]周樟炳,张良,黄宗昌城市绿化工程大树移植技术[J]绿色科技2011,(2)
[4]杨秀丽 赵 娟,关于大树移植及管理技术的探讨[J]现代园艺2011(8)
丁鑫,本科园艺专业,硕士研究生,从事园林绿化工作