立井回填及悬吊管竖向荷载的试验研究

来源 :中国矿业大学学报 | 被引量 : 0次 | 上传用户:Maygzs
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
采用模型试验方法,给出了立井回填的过程中出现填料突沉问题的相似准则.通过物理模拟,再现了泥浆夹层的形成与破坏过程,指出泥浆夹层结构的破坏导致填料突沉,进而导致悬吊管竖向荷载的突然增加;为模拟填料突沉,在试验装置底部设置气囊,以底囊排空模拟井中填料的突沉,获得了井中流体、填料级配变化条件下的悬吊管竖向荷载,并推算出原型中的竖向荷载可达40.44MN,足以拉断悬吊管;文中提出采用柔性管接头、减小管土间摩擦系数、优化填料工艺等方法,可有效控制悬吊管的竖向荷载. Using the model test method, the similarity criteria of sudden emergence of filler in the process of backfilling of vertical shaft are given, and the formation and failure process of the mud interlayer are reappeared through physical simulation. It is pointed out that the failure of the mud sandwich structure leads to the sudden rise of filler, In order to simulate the subsidence of the filler, an airbag was set up on the bottom of the test device, the submerged pocket of the filler in the well was emptied through the bottom pocket, and the hanging pipe vertical And the vertical load in the prototype can be calculated up to 40.44MN, which is enough to pull off the suspended pipe. In this paper, the method of flexible pipe joint, reducing the friction coefficient between pipe and pipe, optimizing the packing process and so on, can effectively control the suspension Tube vertical load.
其他文献
柳屯配气站经过近30年的运行,站内集输管网、设备设施老化腐蚀严重,部分汇管壁厚检测不达标、管线腐蚀穿孔、阀门内漏、流量计标定工艺不完善、站内建构筑物及设施不符合安全
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
在对油品进行储运的过程中,静电产生的危害是储运生产安全的最大威胁.油品在收发、输转、灌装过程中,油品分子之间和油品与其他物质之间的摩擦就会产生静电,随着摩擦的加剧,