目前缙云县已建小水电站141处,总装机容量1.5万千瓦,1984年年发电量5000万千瓦小时(度),预测1988年全县需电量为0.97亿千瓦小时,1990年为1亿千瓦小时,2000年为1.35亿千瓦小时。按分月电力电量平衡及负载、事故备用,全县总装机应达5万千瓦,尚需增建3.5万千瓦,为此必须选择容量较大和技术经济条件较优的方案进行开发。经过一年的勘测和规划,决定采取以下措施:
At present, Jinyun County has built 141 small hydropower stations with a total installed capacity of 15,000 kilowatts and an annual generating capacity of 50 million kilowatts hours (kWh) in 1984. It is predicted that in 1988, the county’s electricity demand will be 97 million kilowatt-hours in 1990 and 100 million kilowatt-hours in 1990 And 135 million kilowatt-hours in 2000. According to the monthly power balance and load, accident backup, the county total installed capacity should reach 50,000 kilowatts, still need to build 35,000 kilowatts, this must be larger capacity and technical and economic conditions for the development of the program. After a year of surveying and planning, decided to take the following measures: