论文部分内容阅读
湘潭锰矿石冲矿段是该矿持续生产的矿区,共计探明碳酸锰矿石工业储量266.6万t,远景储量21万t。由于库容106万M~3的柴山水库正好座落在石冲矿段的中心部位,而以往历次的地质勘探工作均未对柴山水库库区的水文地质、工程地质进行系统勘察工作,更来对水下矿体开采时的影响程度进行全面研究,这不仅影响矿段地质储量的批准,更
The Xiangtan Manganese Ore Filling Segment is a mine that is continuously produced by the mine, with a total proven reserves of 2.666 million tons of manganese carbonate ore and a long-term reserve of 210,000 tons. As the Chaishan Reservoir with a storage capacity of 1.06 million M ~ 3 is located in the center of the Shi Chong section, none of the previous geological exploration work conducted a systematic survey of the hydrogeology and engineering geology of the Chaishan Reservoir Area, Underwater ore mining impact of a comprehensive study, which not only affect the approval of the geological reserves of the ore section, more