高炉产品水渣处理一直是个老大难问题。许多小钢铁厂过去都采用浸渣、排水、人工除渣等笨重的劳动,工作量大,劳动强度高,往往由于除不净而放干渣使矿渣质量降低,为加工水泥带来困难。为了使除渣机械化,给加工水泥提供较好的原料,降低生铁成本,厂党委组织了会战,成立了三结合攻尖小组,发动群众,大打人民战争、从主体设计到设备安装经过了由下至上,由上至下几个过程,土木建筑工程进行了三个反复,在动力方面采用了捞渣
Blast furnace slag treatment has always been a chronic problem. In the past, many small steel mills used heavy labor such as leaching, drainage and manual slag removal. The workload was heavy and the labor intensity was high. Drying slag was often used to lower the quality of slag due to the net deficiency, which made it difficult to process cement. In order to mechanize the deslagging, to provide better raw materials for the processing of cement, reduce the cost of pig iron, the factory party organized a battle, set up three combined attacking apex group, mobilize the masses, fights the people’s war, from the main design to equipment installation after Bottom to top, from top to bottom a few processes, civil engineering carried out three repeated, using power in the slag