论文部分内容阅读
鞍山热能研究所与吉林省辉南轧钢厂合作,用抚顺矿试验厂生产的煤水浆在异形车间轧钢加热炉上进行了全炉烧煤水浆试验。试验炉长19m,宽2.08m,全炉无绝热保温措施。该炉临近大修,炉墙局部倾斜,炉子孔洞较多。除将端墙前移1m以外,没有进行其它改动和修善。在炉子端墙和两边侧墙的上下各装两个DWS—1型煤水浆烧嘴。试验由于车间坯料不足,分两段(1988年8月3~6日和8月20~21日)连续进行,共进行85h,烧钢45t。
Anshan Thermal Energy Research Institute and Huinan rolling mill in Jilin Province, Fushun mine pilot plant production of coal slurry in the special-shaped furnace rolling furnace on the whole furnace coal slurry test. Test furnace length 19m, width 2.08m, the furnace no thermal insulation measures. Near the overhaul of the furnace, furnace wall partial tilt, furnace holes more. In addition to the end wall forward 1m, no other changes and improvements. Two DWS-1 coal slurry nozzles are installed above and below the furnace end wall and both side walls. Due to the lack of workshop blank, the test was carried out continuously in two stages (from August 3 to August 6, 1988 and from August 20 to August 21, 1988) for 85 hours and 45 tons of steel.