通过对六线6717螺杆更换以及缓冲料箱不出料情况的案例分析,讨论问题,分析处理方法,进而对预研磨料箱的结构、工作方式、螺杆传输方式等问题进行分析总结。
Through the case analysis of six-wire 6717 screw replacement and buffer hopper not discharging, the problems were discussed and the treatment methods were analyzed. Then the structure, working mode and screw transmission mode of pre-grinding abrasive tank were analyzed and summarized.