小湾水电站大坝施工工期与施工导流程序和导流方式密切相关 .在编制进度计划时 ,工序的持续时间和总工期的分析 ,必须考虑计划的不确定性 .将模糊三角数引入工期分析计算中 ,提出了模糊网络计划及工期实现的可能性 ,为了大坝建设的合理工期决策提供了理论依据和分析的手段 .
The construction period of dam for Xiaowan Hydropower Station is closely related to the construction diversion flow and diversion method.During the preparation of the schedule, the analysis of the duration and total duration of the operation must take into account the uncertainty of the plan.The introduction of fuzzy trigonometry into the construction period In the calculation, the possibility of the fuzzy network plan and the realization of the construction period is proposed, which provides the theoretical basis and the analysis method for the reasonable construction period decision of the dam construction.