本文根据国内某AP1000核电依托项目1#、2#机组CA01大型结构模块就位后结构附件安装情况,主要从施工逻辑及施工技术措施方面对工期的影响进行研究、优化。目的是总结经验,为类似模块或后续AP1000核电工程施工提供更加优良的施工方案及方法,提高施工效率,缩短工期,降低成本,为项目更加有效的完成提供一定的参考指导。
In this paper, according to the domestic AP1000 nuclear power project 1 #, 2 # unit CA01 large-scale structural modules in place after the installation of structural accessories, mainly from the construction logic and construction techniques and measures on the duration of the study, optimization. The purpose is to summarize experience, provide more excellent construction schemes and methods for similar modules or subsequent AP1000 nuclear power project construction, improve construction efficiency, shorten the construction period, reduce costs and provide some reference guidance for the project to be completed more effectively.