论文部分内容阅读
这台电动运输车现已投入运行,使用效果良好。中南地勘局已于1979年11月在三○一大队六分队召开了现场经验交流会,现摘录主管部门(三局探矿处)的评价如下: 中南地勘局三○一大队为加速普查坑道机械化,除使用12千瓦柴油发电机组为动力带动电动凿岩、3千瓦离心式通风机通风及“长江”型往复式水泵供水外,还自制一台电动无轨运输车运碴,初步实现了普查坑道机械化作业(装岩问题尚待解决)。该队的电动无轨运输车经生产使用,证明结构简单、重量轻、操作灵便,在目前尚无装运机装运岩石的条件下,也是解决运岩的一种办法。
This electric transporter has now been put into operation and its use has been effective. The Central South Bureau of Geological Prospecting held an on-site experience exchange meeting in the Sixth Division of the Sanming Team in November 1979. The excerpts from the competent authorities (the Third Bureau Prospecting Office) were evaluated as follows: The Sanzhao Brigade of the Central South Bureau of Geological Survey accelerated the census tunnel. Mechanization, in addition to the use of 12-kilowatt diesel generator sets for power-driven electric rock drilling, 3 kW centrifugal ventilator ventilation and “Yangtze River” type reciprocating pump water supply, but also a self-made electric trackless transport truck transport, preliminary realization of the census tunnel Mechanized operation (the problem of rock loading has yet to be solved). The team’s electric trackless transporter has been proved to be simple in construction, light in weight, and easy to operate. It is also a way to solve the problem of transporting rock under conditions where no loader is currently shipping the rock.