如何做好煤炭系统的锁口工程

来源 :建筑工人 | 被引量 : 0次 | 上传用户:tcsr888
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
在煤矿工程中,井筒的锁口工程是井下工程与地面工程的连接点。锁口工程由于工期紧、任务重、施工难度大、危险系数高,从建设单位、监理单位到施工单位无不对其高度重视。一、施工前的准备1.施工的分班时间在锁口工程施工期间由于是24h不间断 In the coal mine project, the wellbore lock-mouth project is the connection point between the underground project and the ground engineering. Lock project due to the tight schedule, heavy tasks, construction of large, high risk factor, from the construction unit, supervision unit to the construction unit all attach great importance to it. First, the preparation before the construction 1. The construction of the sub-class time in the lock construction period is not interrupted 24h
其他文献
Precursors with NiCO3·2Ni(OH)2·2H2O-and Fe2O3·nH2O-coated alumina,graphite and cenosphere were synthesized by precipitation using ferrous sulfate,nickel sulf
中外建筑师合作是发展的必然趋势,它既是一种挑战,又是一种机遇.这种合作是企业之间的沟通、文化之间的沟通、专业技术之间的沟通,更是人与人之间的交流,合作中各自发挥其所
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
In this study, new types of hybrid gold poly(methyl methacrylate) (PMMA) nanomaterials are synthe-sized. Both PMMA spheres coated with gold nanoparticles and go
The immobilization of titanium dioxide(TiO2) on activated carbon fiber(ACF),(TiO2/ACF),was accomplished by sol-gel-adsorption method followed by calcination at
Random packed beds have more complex interior structure than structured beds and are widely used in industry and engineering. CFD simulation was carried out to
An on-line full scan inspection system is developed for particle size analysis. A particle image is first obtained through optical line scan technology and is then analyzed using digital image process
前不久,索尼发布了新的EX系列投影机,包括适用于商务娱乐的VPL-EXl00,适用于商务教育环境的VPL-EXl20,以及专门为教育行业开发的VPL-EXl45和VPL-EXl75。它们的机身外观和主要规格特性都十分相似,主要是亮度对比度等方面有所区别。送到《个人电脑》实验室评测的是其中的VPL-EXl45。  VPL-EXl45采用白色的机身并沿袭了这一系列独特的前高后低倾斜式机身设计。VPL-
期刊
任命David Miller为总经理,领导公司业务发展长沙2008年11月11日电/新华美通/--今日,佩罗系统公司(纽约证交所代码:PER)宣布正式在中国市场推出公司旗下的医疗卫生行业IT服务
期刊