论文部分内容阅读
牟山水库溢洪闸于1967年5月底交付使用。闸门建成后虽经几次防锈处理,均不够理想,在反复调查论证,认真分析的基础上,选用了PWE高效防腐涂料。该涂料系聚醚、聚氨脂类高级防腐蚀配套涂料。不仅耐化学介质、性能优异,而且抗冲抗磨、施工性能好,具有较高的耐久性。 在具体施工中,对钢闸板的所有外露面全部采用喷砂除锈。应选择颗
Moushan reservoir spillway gate delivered in late May 1967. After the completion of the gate after several rust-proof treatment, are not ideal, after repeated investigation and demonstration, careful analysis, based on the selection of PWE anti-corrosion coating. The coating is polyether, polyurethane anti-corrosion coating supporting advanced. Not only resistant to chemical media, excellent performance, and anti-impact wear, construction performance, with high durability. In the concrete construction, all the exposed surfaces of the steel gate are all sandblasted and rust-removed. Should choose the stars