论文部分内容阅读
近年来,水利水电建设行业竞争日趋激烈,造价管理显得越来越重要。当前水利水电建设项目的造价管理主要分为前期的决策、设计阶段和后期施工阶段。本文从水利水电工程项目施工阶段造价管理的角度出发,结合文献研究和访谈调查,总结出水利水电工程项目施工阶段造价管理的5个版块(施工前期准备、施工管理、监查方面、合同方面和其他方面)及其相应要求,并在此基础上进一步结合水利水电工程项目具体实施过程,对施工阶段造价管理进行探索,对施工阶段的成本控制有一定的意义。
In recent years, water conservancy and hydropower construction industry increasingly competitive, cost management is more and more important. The current water conservancy and hydropower construction project cost management can be divided into the early stage of decision-making, design and post-construction stage. Based on the literature review and interviews, this paper summarizes the cost management of water conservancy and hydropower projects in the construction stage from the perspective of cost management during the construction phase of water conservancy and hydropower projects. It summarizes five sections of cost management during the construction phase of water conservancy and hydropower projects (pre-construction preparation, construction management, inspection, Other aspects) and their corresponding requirements, and on this basis, to further integrate the specific implementation process of water conservancy and hydropower projects to explore the construction stage cost management, the construction stage of cost control is of some significance.