电力建设项目计划审核是在项目储备固化前与计划下达前,属于项目立项后执行前的把关审核,是项目能够顺利有效开展的前提和关键。本文在总结项目计划审核现状的基础上,分析计划审核存在的问题,并据此建立了包括必要性计划审核、投入产出分析、资料完整性评价三个方面内容的电力建设项目计划审核模型,为审核提供相关评价依据,确定评价规则,以实现对项目审核提供业务及技术的支撑。
The power construction project plan verification is before the project reserve is cured and before the plan is issued, which belongs to the pre-implementation check of the project after the project is set up, which is the precondition and key of the project to be carried out smoothly and effectively. Based on the summary of the status quo of the project plan audit, this paper analyzes the problems existing in the plan audit, and establishes the auditing planning model of the electricity construction project based on the three aspects of necessity plan audit, input-output analysis and data integrity assessment, Provide relevant assessment basis for the audit, and determine the evaluation rules so as to provide the business and technical support for the project audit.