混凝土坝溢流堰顶上的分水齿是一种有效、经济而又良好的消能方式。作者对选择分水齿尺寸和其它有关工程的准则提出修正的建议。 在大坝溢洪时,需要注意的是,确保安全并以控制的方式进行消能。否则,将导致河道下游发生大面积的和不可控制的冲刷。消除这种水能最常用的方法之一,是水跃式消力池。但这种方法建造起来费用昂贵。而且,近期研究结果表明,当遇到库水位与尾水位之间的落差大于50m的重大消能问题时,还是经常运用这种消能方法。
Concrete Diversion Weir at the top of the spill is an effective, economical and good way to dissipate energy. The authors propose amendments to the guidelines on the size of water distribution teeth and other related projects. At the dam spill, care needs to be taken to ensure safety and to dissipate energy in a controlled manner. Otherwise, large-scale and uncontrollable erosion will occur downstream of the river. One of the most commonly used methods to eliminate this water is the jetski. However, this method is expensive to build. Moreover, recent findings show that this energy-dissipating method is often used when there is a significant energy dissipation problem with a drop of more than 50 m between the reservoir water level and the tail water level.