现浇筑混凝土道桥施工技术涵盖的内容很多,根据以往的工程来看,一些工程存在着很多问题,其中包括设计理论不合理,施工团队的技术水平不高,对于养护工作并不重视,致使现浇筑的混凝土道桥的表面出现严重的质量问题,对混凝土结构造成严重的影响,也对道桥在日后的使用中埋下了巨大的安全隐患。根据针对以往工程施工的经验总结,对先浇筑混凝土施工技术的要点进行详细的阐述。
Cast-in-place concrete bridge construction technology covers many contents, according to the past projects, some projects there are many problems, including the design theory is not reasonable, the technical level of the construction team is not high, for the conservation does not pay attention, resulting in The pouring of the concrete bridge surface serious quality problems, the concrete structure has a serious impact, but also on the bridge in the future the use of buried a huge security risk. According to the past experience of construction for the first summary of the construction of concrete pouring points for a detailed elaboration.