高速公路项目建设成本高、周期长,而政府公共资金有限,因而引入BOT模式对我国高速公路的建设和投融资渠道的拓展都具有重要的意义。但BOT模式中涉及利益相关者众多,运营模式较为复杂,因此存在一系列风险因素。在研究重多风险因素的基础上,通过层次分析法找出高速公路BOT项目中的重点风险项,分析并总结相应的防范措施。
The construction cost of the expressway project is high, the period is long, and the government public funds are limited. Therefore, the introduction of BOT mode is of great significance to the construction of expressway and the expansion of investment and financing channels in our country. However, the BOT model involves many stakeholders and the operation mode is complicated. Therefore, there are a series of risk factors. Based on the study of multiple risk factors, the key risk items of expressway BOT project are identified through AHP, and the corresponding precautionary measures are analyzed and summarized.