论文部分内容阅读
从墨玉加汗巴格段防洪工程的实际情况出发,分析本防洪工程防洪堤设计堤顶高程的确定,包括超高计算、堤顶高程的确定等。
Based on the actual situation of flood control project in Moyu-Khanbagh section, the paper analyzes the determination of embankment elevation of the flood control embankment design, including the calculation of ultra-high and the determination of dike elevation.