论文部分内容阅读
黄河干流在青海境内长度为1959.1km、流域面积1.210×105km2,在修建大中型水利水电工程中形成的水库成为优良渔业养殖水域,有较大的渔业挖掘潜力。省内黄河干流龙羊峡水库以下修建水电站形成的水库共9座,已建成7座,分别是龙羊峡、尼那、李家峡、公伯峡、苏只、康扬和直岗拉卡水库;在建3座,分别是拉西瓦、黄丰和积石峡水库,形成库区面积近4.66万公
The length of the Yellow River main stream in the territory of Qinghai is 1959.1km and the drainage area is 1.210 × 105km2. The reservoirs formed during the construction of large and medium-sized water conservancy and hydropower projects have become excellent fishery breeding waters and have great potential for fisheries exploration. There are 9 reservoirs formed by hydropower stations below Longyangxia Reservoir of the Yellow River mainstream in the province and 7 reservoirs have been completed, namely Longyangxia, Nina, Lijiaxia, Gongboxia, Suzhi, Kangyang and Zhiganglaka reservoirs; Three buildings under construction, namely Laxiwa, Huangfeng and Jishishixia reservoirs, formed an area of nearly 46,600