论文部分内容阅读
1987年4月,我院经水利水电规划设计总院指定为部属设计院推行全面质量管理(TQC)的试点单位后,在总院和四川省有关部门的指导与支持下,试点工作取得了一定成效,先后通过了总院代表能源部、水利部组织的达标验收和复查,并于1991年8月获“四川省工程建设质量管理奖”、1992年初被评为“四川省工程建设系统推行全面质量管理先进单位”。五年多来,我院的全面质量管理工作,经历了起步、推行和逐步深化的过程,尽管目前还存在一些问题,但
In April 1987, after the Institute of Water Conservancy, Hydropower Planning and Design appointed as a pilot unit for the implementation of the Total Quality Management (TQC) by the Subordinate Design Institute, the pilot work was conducted under the guidance and support of the General Hospital and the relevant departments of Sichuan Province. The effectiveness has passed the acceptance and review of the standards of the Ministry of Energy and the Ministry of Water Resources on behalf of the Ministry of Energy. It was awarded the Sichuan Construction Quality Management Award in August 1991 and the Sichuan Engineering Construction System in early 1992. Quality Management Advanced Unit". Over the past five years, the overall quality management of our institute has experienced a process of starting, implementing and gradually deepening. Although there are still some problems,