论文部分内容阅读
主螺栓自动旋转装置是实现核容器法兰端48根61/8″-8 UNR-2 A主螺栓的快速安装和拆卸的机械自动装置。本项目的研究较好解决了该装置的结构、动力系统和传动系统的主要参数、技术要求、材料等一系列问题,有效地提高了自动装置的使用性能,确保了核容器主螺栓快速安装和拆卸的精确性和安全可靠性。
The main bolt automatic rotating device is a mechanical automatic device for quick installation and disassembly of 48/8 "-8 UNR-2 A main bolts at the flange end of the nuclear container.The research of this project solves the problem of the structure and power of the device The main parameters of the system and the transmission system, technical requirements, materials and a series of issues, effectively improve the performance of automatic devices to ensure the rapid installation and removal of the nuclear container main bolt accuracy and safety and reliability.