某港机房地下结构底板工程平面为44.5×26(m),厚度为1.4m,现浇混凝土量为1757m~3,以底板中轴线变形缝为界,北端为第Ⅰ流水段,总混凝土量为825m~3;南端为Ⅱ流水段,总混凝土量为932m~3。该工程质量要求高,除必须具有较高的强度外,并要求混凝土必须有良好的密实性、抗渗性和抗裂性。一、流态混凝土配合比本工程于冬期施工,设计要求混凝土强度大于250kgf/cm~2(约25MPa),抗渗标号S8~S10,又是大体积混凝土。为满足施工工艺要求,决定采用流态混凝土。为避免大体积混凝土由于温度应力可能产生的裂缝,需从多方面考虑采取有效措施。
The ground plane of the underground structure of a port room is 44.5×26(m), the thickness is 1.4m, the amount of cast-in-place concrete is 1757m~3, the boundary of the centerline of the bottom plate is the deformation joint, the north end is the first flow section, the total concrete amount is 825m~3; the south end is the II water section, and the total concrete amount is 932m~3. The project requires high quality, in addition to having high strength, and requires that the concrete must have good compaction, impermeability and crack resistance. First, the proportion of fluid concrete The construction of the project in winter, the design requirements of concrete strength greater than 250kgf/cm~2 (about 25MPa), impermeability marking S8 ~ S10, but also a large volume of concrete. In order to meet the construction process requirements, it was decided to use fluid concrete. In order to avoid cracks that may occur in mass concrete due to temperature stress, effective measures must be considered in many aspects.