在纽约港入口处跨越海峡的维拉扎诺海峡桥是由特里波罗(Triborough)桥隧管理局修建的。为了使过境交通远离拥挤的城市中心部分,开辟了南绕行线。木桥为该线上的重要连结。桥上布置为双层桥面,每层六车道。上层桥面将首先使用,而下层桥面留待交通需要时投入使用。运营第一年估计交通量为1260万辆车,最大通过能力估计为每年4500万辆车。桥梁的资金由管理局发售30亿美元收益债券筹措之。没有使用城市或国家税金或信贷。桥梁预计费用总额为30500万美元。
The Verazza Strait Bridge across the Strait at the entrance to New York Harbor was constructed by the Triborough Bridge and Tunnel Authority. In order to keep the transit traffic away from the congested central part of the city, a southbound route was opened up. Wooden bridge is an important link on the line. The bridge is arranged as a double decker bridge with six lanes each. The upper decks will be used first, while the lower decks will be left open for transport when needed. The estimated traffic for the first year of operation is 12.6 million vehicles, with a maximum capacity of 45 million vehicles estimated annually. Bridge funds raised by the Authority for sale of 3 billion U.S. dollars in bonds. No city or state tax or credit is used. The estimated total cost of the bridge is 305 million U.S. dollars.