论文部分内容阅读
介绍了泸天化3#冷却塔的运行情况和改造的原因,以及3#塔第六间的改造内容,并对改造前后的测试结果进行了对比分析与评价,提出了对改造Marly-600型冷却塔的看法。
The operation condition of Lutianhua 3 # cooling tower and the reformation reasons are introduced, and the contents of the sixth rebuilding of No.3 tower are introduced. The test results before and after reformation are compared and evaluated, and the improvement of Marly-600 View of the cooling tower.