摘要:高层建筑工程作为城市化进程的重要内容,由于其层数较多,对土地的利用率高等特点,已经成为现代城市建设的首要选择。本文结合高层建筑施工管理中常见的问题展开论述,结合资金投入大、施工周期长,对混凝土用量集中等特点,从高层建筑工程质量与安全上来提出科学的确保工程施工的有效措施。
关键词:高层建筑 ;质量控制; 施工管理; 问题; 对策
Abstract: the important content of high-rise building as the city process, because of its many layers, etc. the land utilization rate, has become the first choice for the construction of a modern city. Based on the common problems in the management of high-rise building construction is discussed, combined with large investment, long construction period, the concretecharacteristics of concentration, from high-rise buildingconstruction quality and safety to put forward effective measures to ensure the construction of science.
Key words: high-rise building; quality control; construction management; problem; countermeasure
中图分类号: [TU745.1] 文献标识码:A文章编号:2095-2104(2013)
高层建筑工程多以深基坑工程为依托,借助于高强度的承受结构来满足高层建筑大体量、高密度的建筑安全需要。同时,因高层建筑工程结构相对复杂,涉及到的工序也较多,在施工管理中必须从质量控制、进度控制、安全控制等方面来抓住主要矛盾,细化高层施工中重点工序的控制与防范,如对“三线”的控制,对钢筋的控制、对裂缝的控制等。本文将从高层建筑施工管理常见的问题出发,探讨改进和优化工程施工质量控制的有效措施和对策。
一、高层建筑施工中的管理特点及重心
高层建筑工程施工管理是一项综合化的复杂的管理过程,由于涉及到的影响因素较多,对于工程质量控制中的各类偶然性因素及系统性因素的控制要求较高,一旦出现施工工序、仪器测量等方面的差错或误差,从而为整个工程质量管理带来重大安全隐患。因此,从高层建筑工程施工管理来看,其特点主要有:一是高层建筑工期相对较长,项目规模较为庞大,对于项目资金投入与成本控制压力较高,施工管理不善引起的工程延期对于整个工程投资成本的增加尤其突出;二是从高层建筑的施工难度来看,其基础结构对地下空间的深度埋置,增加了基础施工的周期和施工风险;三是从技术角度来看,由于高层建筑结构相对复杂,对工程“三线”控制施工难度较大;四是工程施工组织更为集中,尤其是垂直方向上施工空间的逐步狭小,必然为施工组织增加难度;五是从施工材料和建筑资源的投入上,由于不同设计标准的高层建筑,其工程中对各项设备材料的应用更多,对项目工程中多种设计标准的执行和监督,都是一种严峻的考验;六是从项目施工周期来看,由于高层建筑工程体量较大,施工周期相对较长,期间对施工高度增加过程中的复杂恶劣天气的影响严重;七是从项目施工组织和系统复杂性来看,由于高层建筑在系统的综合性上对施工组织能力的考验更加突出,不仅要加大工程建筑结构的管理,还要从空调系统、强弱电系统、给排水系统,以及消防、楼宇智能等方面来提高高层建筑的整体功能。
从高层建筑工程质量控制管理中,重点在于对“三线”的有效控制,即对“垂直度、轴线、以及标高线”重点控制,以及对施工中混凝土强度进行可靠控制,从而确保整个工程施工质量的安全性。由于高层结构中对大体积混凝土施工的范围较大,对于水泥水化热过程中释放的热量,即温度应力及收缩应力,从而导致工程建筑裂缝的发生可能性较大,因此,加强对高层施工现场混凝土的配合比控制与检查,改善施工工艺和方法来减少裂缝,也是高层建筑工程质量控制的重点,对于高层建筑工程中钢筋质量的控制,由于钢筋节点交叉复杂,对钢筋框架的布置密度、剪力墙等关键部位的质量控制要求更高,不仅要加强钢筋等规格、标准的自检、互检,还要从设计图纸和《高层建筑混凝土结构技术规范》来加以控制,从而确保钢筋的性能达到设计需要。
二、高层建筑施工中的质量控制目标
从高层建筑工程质量控制措施来看,主要分为施工前的质量控制、施工过程中的实时质量控制,以及施工验收阶段的质量反馈控制。结合工程质量控制的内容来看,通过科学的组织施工、合理的分部实施,全面的工程监理来完成对控制目标的实现,并从组织控制的主体上发挥各职能部门的积极作用,确保控制对象在规范的施工工艺环境下能够处于可靠的受控状态,具体来说主要从以下几点来强化:一是对“人的因素”的规范与控制,人作为项目施工管理的重点,在充分发挥人的优势的同时,也要从质量意识、责任意识、以及安全认识上来提升工程施工质量控制水平,把住人的心理懈怠、行为倦怠,确保人的有效控制;二是从工程施工材料的控制上,认真落实“三验收”制度,强化对进场材料的严格审验,合理有序堆放,并做好日常安全,及材料领用的科学管理;三是从机械设备的管理上健全制度和规范,对各类吊装设备在安装、拆除、运行管理中的全面检查,如对塔吊的安全装置进行常规检查,确保各力矩限制器、超限、超重等部件的灵敏与可靠,对施工工地中常用的机械,如搅拌机、钢筋机械、翻斗车等进行日常巡检和维护,确保施工现场各设施的齐全、有序、安全,同时,对于施工中用到的水、电、气等设施,要加大安全防范措施,如对电源开关绝缘性的电阻测试,对于阳气瓶、乙炔瓶设立警示标志,对于砂轮机、切割机等防护装置的安全检查,确保人机安全。
三、加强对高层建筑施工管理控制的有效措施
3.1 完善工程质量管理体系,强化质量控制监督
对于高层建筑施工中的质量控制,其重点是对人的控制,从制度上来明确分工与职责,做好工程施工组织的协调与沟通,严格施工队伍能力审查,注重工程施工进度的合理安排与协调,对于施工中出现的进度与质量矛盾,要从劳动力的科学安排和施工工器具的合理调度中来确保施工任务的有序进行。同时,对于施工中各类原材料、半成品、成品的采购与管理,要建立完善的质量、数量、规格验收文案管理制度,切实落实质检責任。
3.2 强化工程质量技术控制力度,确保工程施工工艺满足设计规范
对于高层施工技术控制来说,对于施工流水段的划分要合理,对筒体结构的单一划分,对施工主体结构工程要采取一次性浇筑工艺等。同时对施工现场与施工图纸之间出现的误差要进行实测放线,如对工程施工标高的抄测时,视距差要控制在20mm内,对于标高及混凝土面层控制线,要结合轴线来进行控制垂直偏差,对桩基支撑、地梁结构的浇筑施工中,对于超过3m的应该设置串筒,避免混凝土的离析作用,对桩护壁的浇筑时,需要先对桩中心及垂直度进行校准,对施工现场钢筋的质量、规格等参数进行抽样验收,对于墙体、梁、板等结构钢筋的绑扎时,要结合施工工艺要求,确保整直、除锈,特别是对于柱钢筋进行绑扎时,科学计算箍筋数量,以错开方式来做好接口的循环焊接。
3.3 注重成品保护,确保工程质量的有效控制
对于高层建筑施工质量控制来说,成品保护是确保整个工程质量的重要环节,如在土方的开挖与回填施工中,对各标高、桩、轴线位置的有效保护,在工程模板施工中要注意装拆规范,避免对板面平整度的影响,对于施工好的防水层的有效保护,确保地漏、管根的保护,防止碰损、变位等。
参考文献:
[1] 杨艳平,郑秋芳.高层建筑的施工安全问题与防范措施[J]. 河南科技. 2013(06)
[2] 任兆江.高层建筑施工管理存在的常见问题及对策[J]. 价值工程. 2010(35)
[3] 王铁军.高层建筑施工项目质量管理与控制研究[D]. 西安建筑科技大学 2009
关键词:高层建筑 ;质量控制; 施工管理; 问题; 对策
Abstract: the important content of high-rise building as the city process, because of its many layers, etc. the land utilization rate, has become the first choice for the construction of a modern city. Based on the common problems in the management of high-rise building construction is discussed, combined with large investment, long construction period, the concretecharacteristics of concentration, from high-rise buildingconstruction quality and safety to put forward effective measures to ensure the construction of science.
Key words: high-rise building; quality control; construction management; problem; countermeasure
中图分类号: [TU745.1] 文献标识码:A文章编号:2095-2104(2013)
高层建筑工程多以深基坑工程为依托,借助于高强度的承受结构来满足高层建筑大体量、高密度的建筑安全需要。同时,因高层建筑工程结构相对复杂,涉及到的工序也较多,在施工管理中必须从质量控制、进度控制、安全控制等方面来抓住主要矛盾,细化高层施工中重点工序的控制与防范,如对“三线”的控制,对钢筋的控制、对裂缝的控制等。本文将从高层建筑施工管理常见的问题出发,探讨改进和优化工程施工质量控制的有效措施和对策。
一、高层建筑施工中的管理特点及重心
高层建筑工程施工管理是一项综合化的复杂的管理过程,由于涉及到的影响因素较多,对于工程质量控制中的各类偶然性因素及系统性因素的控制要求较高,一旦出现施工工序、仪器测量等方面的差错或误差,从而为整个工程质量管理带来重大安全隐患。因此,从高层建筑工程施工管理来看,其特点主要有:一是高层建筑工期相对较长,项目规模较为庞大,对于项目资金投入与成本控制压力较高,施工管理不善引起的工程延期对于整个工程投资成本的增加尤其突出;二是从高层建筑的施工难度来看,其基础结构对地下空间的深度埋置,增加了基础施工的周期和施工风险;三是从技术角度来看,由于高层建筑结构相对复杂,对工程“三线”控制施工难度较大;四是工程施工组织更为集中,尤其是垂直方向上施工空间的逐步狭小,必然为施工组织增加难度;五是从施工材料和建筑资源的投入上,由于不同设计标准的高层建筑,其工程中对各项设备材料的应用更多,对项目工程中多种设计标准的执行和监督,都是一种严峻的考验;六是从项目施工周期来看,由于高层建筑工程体量较大,施工周期相对较长,期间对施工高度增加过程中的复杂恶劣天气的影响严重;七是从项目施工组织和系统复杂性来看,由于高层建筑在系统的综合性上对施工组织能力的考验更加突出,不仅要加大工程建筑结构的管理,还要从空调系统、强弱电系统、给排水系统,以及消防、楼宇智能等方面来提高高层建筑的整体功能。
从高层建筑工程质量控制管理中,重点在于对“三线”的有效控制,即对“垂直度、轴线、以及标高线”重点控制,以及对施工中混凝土强度进行可靠控制,从而确保整个工程施工质量的安全性。由于高层结构中对大体积混凝土施工的范围较大,对于水泥水化热过程中释放的热量,即温度应力及收缩应力,从而导致工程建筑裂缝的发生可能性较大,因此,加强对高层施工现场混凝土的配合比控制与检查,改善施工工艺和方法来减少裂缝,也是高层建筑工程质量控制的重点,对于高层建筑工程中钢筋质量的控制,由于钢筋节点交叉复杂,对钢筋框架的布置密度、剪力墙等关键部位的质量控制要求更高,不仅要加强钢筋等规格、标准的自检、互检,还要从设计图纸和《高层建筑混凝土结构技术规范》来加以控制,从而确保钢筋的性能达到设计需要。
二、高层建筑施工中的质量控制目标
从高层建筑工程质量控制措施来看,主要分为施工前的质量控制、施工过程中的实时质量控制,以及施工验收阶段的质量反馈控制。结合工程质量控制的内容来看,通过科学的组织施工、合理的分部实施,全面的工程监理来完成对控制目标的实现,并从组织控制的主体上发挥各职能部门的积极作用,确保控制对象在规范的施工工艺环境下能够处于可靠的受控状态,具体来说主要从以下几点来强化:一是对“人的因素”的规范与控制,人作为项目施工管理的重点,在充分发挥人的优势的同时,也要从质量意识、责任意识、以及安全认识上来提升工程施工质量控制水平,把住人的心理懈怠、行为倦怠,确保人的有效控制;二是从工程施工材料的控制上,认真落实“三验收”制度,强化对进场材料的严格审验,合理有序堆放,并做好日常安全,及材料领用的科学管理;三是从机械设备的管理上健全制度和规范,对各类吊装设备在安装、拆除、运行管理中的全面检查,如对塔吊的安全装置进行常规检查,确保各力矩限制器、超限、超重等部件的灵敏与可靠,对施工工地中常用的机械,如搅拌机、钢筋机械、翻斗车等进行日常巡检和维护,确保施工现场各设施的齐全、有序、安全,同时,对于施工中用到的水、电、气等设施,要加大安全防范措施,如对电源开关绝缘性的电阻测试,对于阳气瓶、乙炔瓶设立警示标志,对于砂轮机、切割机等防护装置的安全检查,确保人机安全。
三、加强对高层建筑施工管理控制的有效措施
3.1 完善工程质量管理体系,强化质量控制监督
对于高层建筑施工中的质量控制,其重点是对人的控制,从制度上来明确分工与职责,做好工程施工组织的协调与沟通,严格施工队伍能力审查,注重工程施工进度的合理安排与协调,对于施工中出现的进度与质量矛盾,要从劳动力的科学安排和施工工器具的合理调度中来确保施工任务的有序进行。同时,对于施工中各类原材料、半成品、成品的采购与管理,要建立完善的质量、数量、规格验收文案管理制度,切实落实质检責任。
3.2 强化工程质量技术控制力度,确保工程施工工艺满足设计规范
对于高层施工技术控制来说,对于施工流水段的划分要合理,对筒体结构的单一划分,对施工主体结构工程要采取一次性浇筑工艺等。同时对施工现场与施工图纸之间出现的误差要进行实测放线,如对工程施工标高的抄测时,视距差要控制在20mm内,对于标高及混凝土面层控制线,要结合轴线来进行控制垂直偏差,对桩基支撑、地梁结构的浇筑施工中,对于超过3m的应该设置串筒,避免混凝土的离析作用,对桩护壁的浇筑时,需要先对桩中心及垂直度进行校准,对施工现场钢筋的质量、规格等参数进行抽样验收,对于墙体、梁、板等结构钢筋的绑扎时,要结合施工工艺要求,确保整直、除锈,特别是对于柱钢筋进行绑扎时,科学计算箍筋数量,以错开方式来做好接口的循环焊接。
3.3 注重成品保护,确保工程质量的有效控制
对于高层建筑施工质量控制来说,成品保护是确保整个工程质量的重要环节,如在土方的开挖与回填施工中,对各标高、桩、轴线位置的有效保护,在工程模板施工中要注意装拆规范,避免对板面平整度的影响,对于施工好的防水层的有效保护,确保地漏、管根的保护,防止碰损、变位等。