以宁德核电1号机组从满功率甩负荷到厂用电试验前提条件、主要风险、预防措施、甩厂电后主要参数特性变化,给出了甩厂电工况特性以及需优化的措施。
Based on the preconditions, main risks, precautionary measures and the change of main parameters after rejection of power plant from Ningxia Nuclear Power Station 1 unit from full power load rejection to factory power consumption test, the power plant operating characteristics and the measures to be optimized are given.