由贵州省地矿局117队承担的《贵州省仁怀—遵义长岗向斜煤炭整装勘查》项目进入收尾阶段,根据现有工程资料初步预算,勘查区333+334类总资源量约8亿t,达大型规模。该项目于2013年1月进场,预计工期到2014年6月,面积约259km~2。本次勘查任务主要是通过地质填图、钻探工程揭露控制煤层、采样测试等勘探方法和手段,确定勘查区地层层序,初步查明勘查区
The “Renhuai-Zunyi Changgang Synclinal Coal Prospecting Project” undertaken by Guizhou Provincial Bureau of Geology and Mineral Resources 117 has come to an end. Based on the preliminary budget of existing engineering data, the total resources of 333 + 334 in the exploration area are about 8 Billion t, up to large-scale. The project came into operation in January 2013 and is expected to have a construction period of about 259km ~ 2 by June 2014. The exploration task is mainly through geological mapping, drilling engineering exposing control of coal seams, sampling and other exploration methods and means to determine the stratigraphic sequence of the exploration area, tentatively identify the exploration area