“两硬”大采高采场覆岩运动规律相似材料模拟研究

来源 :煤炭技术 | 被引量 : 0次 | 上传用户:ggy353566
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
根据星村煤矿3302综放工作面的地质资料和开采技术,在几何比1∶100的条件下制作了3 m×0.3 m×1.8 m的相似模拟材料模型,在模型的正面不同层位共布设了8层位移基点,用电子经纬仪来观测岩体在开采过程中的位移变化情况;共布置6条间距200 mm的压力水平测线,通过压力传感器来监测覆岩的支承压力。实验室内相似材料模拟实现了对煤层开采过程中覆岩运动的全程观测。 According to the geological data and mining technology of 3302 fully mechanized top coal caving face in Xingcun Coal Mine, a similar simulated material model of 3 m × 0.3 m × 1.8 m was fabricated under geometric ratio of 1: 100. The 8-layer displacement base point was used to observe the displacement change of the rock mass during the mining process with the electronic theodolite. Six pressure measurement lines with a spacing of 200 mm were arranged and pressure sensors were used to monitor the bearing pressure of the overburden rock. Simulation of similar materials in the laboratory realizes the whole observation of overlying strata movement during the process of coal seam mining.
其他文献
新疆屯宝煤矿1154工作面,若借助经验公式推算确定“三带”高度误差较大;若采用现场实测,则成本高、周期长,难以做到提前预判。采用相似材料模拟试验,定性分析采动影响下覆岩
道路建设被列为我国国家建设项目的重要组成部分;桥梁建设也定为道路建设项目的重要组成部分.为了实现路桥施工工程整体质量的提高,在本案,笔者着重探析了路桥施工中防水层施
随着我国经济建设的不断发展,到道路交通事业的要求也越来越高,软土地基的处理加固,是道路桥梁施工中常会遇到的问题,处理不当则会对道路桥梁的施工和使用质量造成很大的影响
期刊
以神东矿区石圪台煤矿31201工作面为研究对象,根据围岩物理力学参数,构建平面相似模拟模型。在实验过程中分析模拟支架的力学特征,支架额定工作阻力18 000 k N能够满足生产需
目前,根据陆军的装备理念可将世界上的主要国家大致划分为三大阵营:第一阵营:在大多数国家中,安全政策的转变实际上并未对本国的装备理念产生影响。这些国家的陆军仍然用于进
本文介绍了当前陕西高速公路及桥梁破坏的现状和需要维护的必要性,分析了高速公路及桥梁养护管理存在的问题,阐述了高速公路及桥梁养护管理技术的对策,并提出了加强养护管理
化学工业的生产特点及其在安全环保方面的特别要求决定了企业员工培训和学校学生的实习都不允许在真实的生产装置上动手操作,解决这一难题的途径之一是开发具有真实工业场景
公路桥梁的施工管理是一项专业性、实践性较强的管理工作.其管理的好坏直接影响工程的质量、安全、进度等必要因素.本文主要从公路桥梁建设工程的施工管理现状及特点入手,对
期刊