Overvoltage is one of the key factors influencing whether Yunnan--Guangdong UHVDC Project can be operated in Islanded Mode or not. Based on the on site test par
To solve the contamination flashover problem for transmission lines in high-altitudes area, an analysis of the {lashover performance of contaminated ± 800 kV u
In order to study the current control strategy based on the chain circuit static synchronous compensator (STATCOM) dynamic model and the design control system wit