在详细分析现有勘测成果的基础上,结合工程主厂房和烟囱的结构特点、荷载情况,提出了不同的地基处理方案,经过比较,确定主厂房和烟囱采用桩基础,桩型为混凝土预制桩。对于类似工程的地基处理可供相关科研和设计人员参考。
Based on the detailed analysis of the existing survey results, different foundation treatment schemes are proposed based on the structural features and load of the main plant and chimney. After comparison, it is determined that the main plant and the chimney adopt the pile foundation and the pile type is the concrete precast pile . Foundation for similar projects for scientific research and design staff reference.