论文部分内容阅读
全国43座重点危险水库之一的羊毛湾水库在水利部关怀和支持下,经过近5年的努力,胜利完成了除险加固任务。于1990年11月6~8日由陕西省水利水土保持厅主持,对该库除险加固工程进行了竣工验收。羊毛湾水库位于陕西省关中西部渭河支流漆水河中游,坝址在乾县石牛乡羊毛湾村北,是一座以灌溉为主,兼顾防洪、养殖等综合利用的大(二)型工程。该库于1958年10月和1966年10月两次动工修建,1969年12月关闸蓄水,1973年5月全部建成。水库总库容1.2亿m~3,有效库容0.522亿m~3,设计灌溉面积32.54万亩,有效灌溉面积24万亩。水库枢纽由均质土坝、输水洞、泄水底洞和溢
With the care and support of the Ministry of Water Resources, Woolwamu Reservoir, one of the 43 key dangerous reservoirs in the country, successfully completed the task of eliminating danger and reinforcing with the efforts of nearly five years. From November 6 to November 8, 1990, Shaanxi Provincial Bureau of Water Conservancy and Soil Conservation, presided over the completion of inspection of the project for reinforcement and reinforcement. The wool bay reservoir is located in the middle reaches of the Qiushui River, a tributary of the Weihe River in the western part of Guanzhong, Shaanxi Province. The dam site is in the north of Wool Bay Village, Shixue Township, Qianxian County. It is a large (2) type project that mainly uses irrigation and takes comprehensive utilization of flood control and aquaculture into consideration. The library in October 1958 and October 1966 twice to start construction in December 1969, gate water storage, completed in May 1973. The total storage capacity of the reservoir is 120 million m 3, and the effective storage capacity is 0.522 billion m 3. The designed irrigation area is 325,400 mu and the effective irrigated area is 240,000 mu. Reservoir hub by the homogeneous earth dam, water hole, bottom hole and spill overflow