天津市滨海新区中央大道海河隧道工程采用沉管法施工。该沉管隧道连接段是连接沉管水中段与陆地段之间的主体段,基坑开挖深度深,且位于滨海相软弱土区内临河施工,需经历管段出坞、支撑拆除、钢围堰施工以及最终接头施工、支撑再次安装等过程。通过对大型沉管隧道连接段主体结构关键技术研究,解决了在小基坑多道支撑下有限空间内,PC拉索、端钢壳、外包防水、端封门等工程部位施工难点,保证了主体结构施工质量和安全。
Central Avenue, Binhai New Area, Tianjin, Haihe River tunnel project using the pipe construction. The immersed tunnel connecting section is the main section connecting the middle section of the immersed tube with the land section. The deep excavation depth of the foundation pit lies in the soft water area of the coastal phase, Weir construction and the final joint construction, support installation again process. Through the research on the key technology of the main structure of the large immersed tunnel connecting section, the construction difficulties of the PC rope, the end steel shell, the outer waterproof, the end sealing door and other engineering parts in a limited space under the multi-channel support of small foundation pit are solved, Structural construction quality and safety.