论文部分内容阅读
随着水电建设规模的加大,为了适应形势,满足市场要求,加强水电工程的造价管理,《水电工程设计概算编制办法及计算标准》(2002年版)对独立费用进行了调整,并提高了相应标准;然而,由于近来水电建设力度比较大,新的能源点将越来越少,不少老电站相继进行扩机,因此建议独立费用中的工程建设管理费按新建、改扩建工程分不同等级和规模进一步细分工程建设管理费的取费标准。
With the expansion of hydropower construction, in order to adapt to the situation, meet the market requirements and strengthen the cost management of hydropower projects, the independent expenses have been adjusted and the corresponding costs have been raised correspondingly to the “Hydropower Engineering Design Budget Compilation Methods and Calculation Standards” (2002 Edition) Standards; However, due to the recent efforts to build hydropower relatively large, new energy points will be less and less, many older power plants have been carried out expansion, it is proposed independent costs of construction management fee according to new construction, renovation and expansion project at different levels And the size of further subdivision construction management fee fee.