论文部分内容阅读
简要介绍赵山渡引水枢纽工程测区的工程地质概况 ,对施工阶段右岸重力坝主要工程地质问题进行分析和研究 ,经过处理能满足设计要求 .
This paper briefly introduces the engineering geology of Zhaoshandu water diversion project, analyzes and studies the major engineering geological problems of the right bank gravity dam during the construction stage, and meets the design requirements through the treatment.