近两年,鞍钢在组织大宗原燃材料供应工作中遇到了巨大困难。主要是国家计划分配指标大幅度减少,合同到货率普遍降低;计划外市场调节资源短缺,现有的物资贸易中心又满足不了大型企业大宗原燃材料需求。1988年,国家计划分配的主要原燃材料平均只能满足80%,1989年下降至75%左右。诸多的国家指令性计划分配物资的供应,因受电、资金、原材料、运输等外部因素的影响不能按时执行合同到货,欠交量大。如1988年全年洗煤欠交114万多吨,无烟煤欠交43
In the past two years, Ansteel encountered great difficulties in organizing the supply of bulk raw materials for burning natural gas. Mainly due to the drastic reduction of the indicators of planned distribution of the country and the generally lower contractual arrival rate. The shortage of resources in the planned market and the existing material trade center can not meet the demand of bulk raw materials for large-scale enterprises. In 1988, the average amount of major raw materials distributed by the state plan could only meet 80% on average, and dropped to about 75% in 1989. In many countries, the planned supply of allocated materials can not be delivered on time due to external factors such as electricity, capital, raw materials and transportation. For example, the whole year of washing coal owed more than 1.14 million tons of coal and the anthracite owed 43