论文部分内容阅读
7月29日这天,是通化铁路分局浑江工务段干部职工永远难忘的日子。连续一天一夜的暴雨使长白山区山洪暴发,江河水位陡涨,大小沟岔水疾如箭,大地一片汪洋。 这天傍晚,忙碌了一天的养路工长杨本平又一次从工区来到段里,询问水情。19时,当他得知工区管内鸭大线41公里990米处发生山体塌方,泥石流埋没线路时,立即带领工区4名职工,乘轨道车迅速赶赴水害现场。 大雨一个劲儿地下,塌方地点渐渐笼罩在黑暗之中,涵洞水流轰鸣如故,江中洪水下停地咆哮,暴雨击打地面发出可惜的声响。此时,杨本平和他的工友们借助手电和信号灯发出的微弱光亮,艰难地清除了塌方落石。线路疏通后,他让班长李成玉和另一名职工留下继续监视险情,又同另外两人撤回段里待命,随时准备到更危险的地方抗洪抢险。
July 29 this day, Tonghua Railway Branch Hunjiang cadres and workers will never forget the day. Continuous night of heavy rains led to the outbreak of flash floods in Changbai Mountain area. The water level of the river plunged up and the size of the river changed like a arrow. The land was vast. On the evening of the same day, Yang Benping, a road maintenance engineer who had been busy for a day, came again to the section from the work area to ask about the water situation. At 19:00, when he learned that mountain landslides occurred at 990 meters at 41 kilometers of Yamanao line in the tube area and buried mudslides in the area, he immediately led four workers in the work area and quickly rushed to the scene of water damage by rail vehicles. Heavy rain continued underground, landslides gradually shrouded in darkness, culminating in the flood of cul-de-sac, the river roared to stop under the flood, hit the ground a heavy rain sent a pity. At this point, Yang Benping and his coworkers struggled to clear the landslide by using the faint light emitted by the flashlights and signal lights. After the route was cleared, he let the squad leader Li Chengyu and another worker left to continue to monitor the dangerous situation, and with the other two to withdraw the standby section, ready to go to more dangerous places to fight floods and rescue.