中俄合作建设的连云港核电站,厂址位于江苏省连云港市连云区后云台山南麓的扒山头。规划布置四台百万千瓦级压水堆核电机组,并留有再建余地。第一期工程建设两台在 WWER-1000/320型核电机组的基础上改进的 WWER-1000/428 AES-91型俄罗斯机组,每套机组的主工艺设备采用额定热功率为3000MW 的 V-428型反应堆装置,配有 TBB-1000-2Y3型发电机的 K-1000-60/3000型汽轮机装置。机组采用全
Sino-Russian cooperation in the construction of the Lianyungang nuclear power plant, the site of the plant is located in Lianyungang City, Lianyungang City, Jiangsu Province. Planning and layout of four million-kilowatt pressurized water reactor nuclear power units and leaving room for redevelopment. In the first phase, two WWER-1000/428 AES-91 Russian units were improved on the basis of WWER-1000/320 nuclear power units. The main process equipment of each unit was V-428 with a rated thermal power of 3000 MW. Type reactor assembly, K-1000-60/3000 steam turbine unit equipped with a TBB-1000-2Y3 generator. The unit adopts the whole