在电力系统厂网分开的大背景下,发电公司需要建设一套自身控管的水调自动化系统。为此,需要解决以下2个问题:一是继续保持从原有各生产控制系统的数据采集;二是保证生产系统的绝对安全,并满足国家经贸委30号令的安全通信要求。文中研究并提出了一套解决方案。实践证明,该方案满足流域水库群梯级调度自动化的要求,在电力行业具有广泛的借鉴意义。
Under the background that the power system plant network is separated, the power generation company needs to build a set of self-control water regulating automation system. Therefore, we need to solve the following two problems: First, continue to maintain data collection from the original production control system; the second is to ensure the absolute safety of production systems and to meet the State Economic and Trade Commission Order No. 30 of the safety communications requirements. The paper studies and proposes a set of solutions. The practice proves that this scheme meets the requirements of automated scheduling of cascade reservoirs and has extensive referential significance in power industry.